Capability
HAZOP, LOPA and SIL studiesfacilitated by practising engineers.
Baker Hughes engaged ATG for SIL, LOPA and functional safety assessment workshops in Jubail, Dammam and Singapore across 2023–2025. The facilitators are control-systems engineers who have commissioned the systems the studies specify.
The number behind the trip.
What ATG delivers
Scope we takeunder our own contract.
- HAZOP facilitation and scribing, node definition, recording and close-out tracking.
- LOPA — initiating events, independent protection layers, target SIL determination.
- SIL verification — PFDavg calculation, architectural constraints, proof-test interval optimisation.
- Safety requirement specification and cause and effect development from the study output.
- Functional safety assessment (FSA) at stages 1 to 5 and gap assessment of existing safety systems.
- Alarm rationalisation and management of change reviews for operating plants.
Platforms and vendors supported
- IEC 61511 lifecycle
- exSILentia / SIL calculation tooling
- Client HAZOP software (PHA-Pro, PHAWorks) or ATG worksheets
Standards applied
- IEC 61511 / ISA 84
- IEC 61508
- IEC 61882 (HAZOP)
- CCPS LOPA guidance
Typical scope of work
From the first meetingto the handover dossier.
The number behind the trip.
- PrepareNode marking, P&ID and C&E gathering, team briefing, terms of reference.
- FacilitateHAZOP, LOPA and SIL workshops with a documented, traceable record.
- CalculateSIL verification, PFDavg, HFT, proof-test intervals and spurious trip rate.
- ReportStudy report, SRS input, recommendations register with owners and close-out evidence.
Where we work
Al-Khobar to Yanbu,and on rotation worldwide.
Kingdom of Saudi Arabia
Own Saudi entity and employer file; established mobilisation to Al-Khobar, Dammam, Jubail, Yanbu, Jeddah, Rabigh, Riyadh. Works under the client or plant project insurance.
International
Engineering and commissioning teams under long- and short-form agreements — residential, rotational and offshore — supported from Al-Khobar and Lahore.
Related projects
Claim,then evidence.
SIL, LOPA and functional safety assessment studies
Ammonia leak detection and safety system — FEED
Functional safety assessment studies
Frequently asked
Questions buyers askbefore the shortlist.
Is the study independent of the implementation?
Yes. Where ATG facilitates a study we do not mark our own homework — the assessment and any implementation scope are kept separate and reported separately.
How long does a SIL study take?
A packaged equipment scope is typically two to five workshop days plus reporting; a process unit depends on node count. We agree the programme and the deliverables list before the workshop.
Can the workshops be held at our plant in Jubail or Yanbu?
Yes. ATG engineers are based in Al-Khobar and mobilise to Jubail, Dammam, Yanbu, Jeddah, Rabigh and Riyadh routinely.
Safety Systems — SIS, ESD, F&G, BMS, HIPPS
SIL-rated safety instrumented systems to IEC 61511 — HIMA, Triconex, ProSafe-RS, Safety Manager, DeltaV SIS.
Detect early. Act correctly. Prove it.Read more →Distributed Control Systems
Yokogawa, Emerson, Honeywell, Siemens, ABB and Foxboro — design, configuration, FAT, commissioning and support.
Large process. Zero surprises.Read more →Industrial Control Systems Training
Platform, functional safety, field-skills and digital courses — at your plant or an ATG facility.
Taught by the people who commissioned it.Read more →Start a conversation
Tell us whatyou need built.
Send the scope, the P&IDs or just the problem. A control-systems engineer — not a sales desk — replies from Al-Khobar, normally within one working day.