Power & Utilities

Industry

Power plant control systemsand electrical integration.

Custody transfer integration on Yokogawa CENTUM VP at SEC PP9 and PP12, more than twenty LV switchgear ATS systems commissioned, and turnkey re-engineering of emergency diesel generator control at Yanbu Phase III for the Saudi Water Authority.

Where the work is

Units and processeswe have automated.

  • Combined cycle and steam power plants
  • Emergency diesel generation and blackout recovery
  • Custody transfer — flow computers and gas chromatographs
  • LV and MV switchgear, ATS and power management
  • Jetty, mooring and metering systems at coastal plants
  • Head-office KPI monitoring

What we are engaged for

Typical scopesin this sector.

  • DCS integration of metering and switchgear
  • Emergency generator control re-engineering and HMI replacement
  • Power management systems and switchgear upgrades
  • Parallel KPI monitoring across plants
  • Legacy SCADA replacement

Reference projects

13 references in Power & Utilities,5 in the Kingdom.

End user and plant only. Contract values, reference contacts and detailed scopes are available on request.

All industries
LocationProjectScopeYears
In-Kingdom
Saudi Arabia
Saudi Water Authority — Yanbu Phase III
Yanbu Phase III — emergency diesel generator, jetty and metering gateway re-engineering
Turnkey re-engineering of MV and LV emergency diesel generator control: Siemens S7-400H / S7-300 logic redevelopment, WinCC / PCS 7 HMI, TP1200 panel replacement, Foxboro DCS integration, jetty mooring SCADA restoration and substation energy-meter gateway communication restoration, including functional testing and commissioning.
Siemens S7-400H WinCC Foxboro
2025–2026
In-Kingdom
Saudi Arabia
Saudi Electricity Company
PP9 custody transfer integration
Integration of flow computer and gas chromatograph data into Yokogawa CENTUM VP DCS, hardware and software.
Yokogawa CENTUM VP
2022–2023
In-Kingdom
Saudi Arabia
Saudi Electricity Company
PP12 custody transfer integration
Integration of flow computer and gas chromatograph data into Yokogawa CENTUM VP DCS, hardware and software.
Yokogawa CENTUM VP
2022–2023
In-Kingdom
Saudi Arabia
Saudi Electricity Company
PP12 LV switchgear ATS systems
Commissioning of more than twenty LV switchgear automatic transfer systems on GE VersaMax PLC and Yokogawa CENTUM VP DCS.
GE VersaMax Yokogawa CENTUM VP
2022–2023
In-Kingdom
Saudi Arabia
Saudi Electricity Company
PP12 air compressor switchgear integration
Commissioning of new LV switchgear: I/O, DCS logic, graphics, alarms and trends on Yokogawa CENTUM VP.
Yokogawa CENTUM VP
2022–2023
International
Angola
Republic of Angola — Ministry of Energy
Emergency power plant design, pre-commissioning, commissioning and O&M
Supervision of electrical and control systems for a 50 MW power plant at Huambo.
50 MW
2017
International
United Arab Emirates
ADGAS (via Siemens Abu Dhabi)
ADMA switchgear upgrade, Das Island
Switchgear upgrade project from initial design through installation and commissioning.
Switchgear
2014–2017
International
United Arab Emirates
ADGAS (via Siemens Abu Dhabi)
LG-7 power generation unit, Das Island
Installation and commissioning of Siemens PCS 7 power management system for the LG-7 extension.
Siemens PCS 7 PMS
2014–2017
International
United Arab Emirates
ADGAS (via Siemens Abu Dhabi)
Blackout recommendations implementation (EPC), Das Island
Installation and commissioning of Siemens PCS 7 power management system for revamp and upgrade works.
Siemens PCS 7 PMS
2014–2017
International
Pakistan
Japan Power Generation Limited, Lahore
SCADA revamp — Sensys Intellimax to PC-based supervisory system
Replacement of the legacy Sensys Intellimax SCADA with a PC-based supervisory system using Mitsubishi GOT visualisation over Mitsubishi Q-series PLCs, including data concentration for plant reporting.
Mitsubishi Q Migration
2013–2014
International
Pakistan
Foundation Power Dharki Company Limited
Separator and coalescer skid E&I and control systems
Complete electrical, instrumentation and control supervision, installation, testing and commissioning; Honeywell Experion DCS.
Honeywell Experion
2017
International
Pakistan
National Power Parks Management Company Limited
Parallel monitoring of 2 × 1,223 MW combined cycle plants
Centralised data gathering from both plants and head-office monitoring of operational KPI data on ABB PGIM.
ABB PGIM KPI
2018
International
Pakistan
Chiniot Power Limited
Parallel monitoring, Chiniot power plant
Combined head-office and mobile monitoring of plant KPI data interlinked with the associated sugar mill on ABB PGIM.
ABB PGIM KPI
2016–2017

Start a conversation

Tell us whatyou need built.

Send the scope, the P&IDs or just the problem. A control-systems engineer — not a sales desk — replies from Al-Khobar, normally within one working day.